One of the reasons for the use of the palletizer: saving artificially, it also saves costs!
For the sake of convenience and space saving, bricks need to be produced after production from the factory. In the traditional production process, the brick must be manual palletizing after molding. Even work more than 10 hours a day, they can only complete the certification of about 20,000 bricks at most! Even if the brick factory uses a small type 4 or 6 brick machine,If all rely on manpower to complete, it will lead to the consequences of the labor intensity, high corporate costs, and low efficiency of code brick workers.
In the past, the block factory adopted artificial palletizing bricks, and only 4 bricks can be cubed at a time with an iron clip. It is calculated by producing 100,000 bricks per day. At least 10 employees work for 12 hours to complete. You also need to pay.
With our intelligent cuber machine, 10 employees can be used to complete 100,000 bricks every day, and now only 2 employees can be completed. One person is responsible for the brick on the split car, and the other is responsible for the management of the equipment.
Not only improves the efficiency, but also greatly reduces the labor intensity of employees. In addition, it only takes 8 hours to get palletized bricks with more than 100,000 pieces! if you consider to improve efficiency of your block factory, please feel free to contact us.
☎ + (86) 18659803696
✉ sales@unikmachinery.com
✓ www.unikblockmachine.com
