Low Cost Hydraulic Automatic Interlocking Cement Brick Making MachineOur Hydraulic interlocking cement brick making machine’s production cycle time is between 13 seconds without and 16 seconds with Face mix on regular Pavers production. This means with a production rate of 5 cycles per minute and 90 % efficiency the average output should be approx. 220 cycles per hour. Depend on the design and shape for the different pavers and Block, the actual hourly production capacity varies. However, please note that the machine speed will be lower with manual labour evolved and increase with more automation.
|
QT9-15 model specification
Main Dimension(L*W*H) | 3670*2650*2867mm |
Useful Moulding Area | 1280*600*40~220mm |
Pallet size (L*W*H) | 1380*680*30~40mm |
Pressure Rating | 12~25Mpa |
Vibration | 60~95KN |
Vibration Frequency | 2800~4800r/min |
Cycle time | 13-18s |
Power | 48.5kW |
Gross weight | 11.5T |
![]() Hydraulic pressure system The hydraulic pressure system is researched and developed by our engineers. The integrated and independent hydraulic valves such as the electromagnetism valve, electro-hydraulic directional control valves etc all imported from Japan (the brand: Yuken) to ensure accuracy and reliability. | ![]() High quality mould Optimized milling strategies and hardening technology ensure the high quality of moulds | ![]() Pallet feeder machine Considering the high labor cost, we have designed the pallets feeder machine for cement brick making machine to tranfer the pallets one by one in automation |

| 1.PL1200 batching station | 2.JS500 Mixer | 3.Cement silo | 4.screw conveyor |
| 5.Cement scale | 6.Conveyor belt | 7.block machine | 8.Automatic stacker |

In order to ensure that our products are always in good working condition during the use process, the company has made the following service requirements on the basis of strictly implementing GB/T1678.1-1997 "industrial products after-sales service" standards:
1. The warranty period is 12 months or 2000 hours.
2. Freely train the operation, maintenance and management personnel for the customer.
3. Respond to relevant customer inquiries in a timely manner.
4. Provide relevant documents and materials to customers.
5. Perform product quality responsibility and provide on-site services such as installation, commissioning and maintenance to customers in a timely manner.
6. Create customer files and track product usage.
7. After the contract takes effect, the customer is responsible for the construction of the supporting facilities and foundation pre-buried by the company, and the main cable is led to the main cabinet; the water source is led to the mixer. Our company provides the complete machine certificate for the equipment.
8. After the customer base is self-accepted, if the customer does not have the conditions to force installation or needs to be re-installed, the customer should sign in writing and the company will charge the corresponding fee.
9. Due to partial improvement and process improvement under the contract, our company has the right to make new designs and improvements without degrading the performance of the original equipment. If the physical object of the contract is different from the contract information, the actual product shall prevail, but the quality level of the equipment shall not be lowered.