Automatic Cement Block Making Machine for sale
QT4-15 Automatic Cement Block Making Machine is designed to meet the mass production of various kinds of concrete masonry blocks like brick,blocks,pavers,slabs,curbs,interlocking types etc by just changing the mould.This machine delivers the endurance and versatility of all our concrete product machine,and adopts the vibration of working bench via the pallet conveying the vibration force to the mould case,which will reduce the vibration loss and reinforce the effect of vibration to improve the hardness of cement block.
Main Features:
|
|
Imported well-know brand hydraulic proportion system | Frequency stepless speed regulation |
![]() | |
Intergrated vibrating bin and vibrating table,improved reliability of vibrating table | |
| Technical Specification: |
Dimension | 5430×3920×2600 mm | |
Pallet Size | 980×560×20mm | |
Vibration Frequency | 3800-4500 r/min | |
Hydraulic Pressure | 25 mpa | |
Vibration Force | 68 KN | |
Cycle time | 15-20s | |
Power | 20 kW | |
Weight | 6200 KG | |
Product size(mm) | Pcs./Pallet | Pcs./Hour |
390*190*190 | 4 | 720 |
390*140*190 | 5 | 900 |
200*100*60 | 16 | 2880 |
225*112.5*60 | 12 | 2160 |


FAQ:
1.Which machine is most suitable for my project?
You should make sure how much work space you have to produce and store blocks, how many blocks you want to produce in a day, what your initial budget for this machine.
2.Can I use just one machine to make every type of blocks?
Yes,Our block making machine is designed to meet the mass production of various kinds of concrete masonry blocks like brick, blocks, pavers, slabs, curbs, interlocking types etc by just changing the mould. all you need to do is remove one type mould and replace with another, which cost at half hour for changing time.
3.what raw materials are required to produce blocks?
Cement, sand, aggregate Fine and coarse aggregates make up the bulk of a concrete mixture. The max diameter should require within 10mm.
4.Can I get installation for this machine?
We will arrange our engineer to your factory to guide installation and training,the customer will be responsible for all wages and expense of engineer.
5.How about warranty?
we promise 12 months guarantee for date of purchase, and agrees to repair or replace any defective part without charge
6.How to use this machine?
As a professional manufacturer, we have many professional engineers, they will go to clients’ site for guiding the installation and training
7. How to use this machine?
As a professional manufacturer, we have many professional engineers, they will go to clients’ site for guiding the installation and training
8.Can you sent me some spare parts freely?
Generally we used to provide wearable spare parts together when block machine while delivery.








