what is run-in period of hydraulic cement block making machine

Leave a message

When it comes to the run-in period, many people may not be unfamiliar with this term. For example, the motorcycles we often ride have a running-in period when they are first bought, and the mechanical equipment of the cement brick making machine also has a running-in period. Through running-in, the internal parts can be more matched to achieve better use effect. If the concrete brick block machine does not pass this stage well during the running-in period, it is easy to cause various failures due to the size of the parts in subsequent production operations. Today we are going to talk about the running-in period of the cement brick machine.

Concrete brick making machine for sale

First of all, after we purchase the cement brick construction machine equipment, we need to go through a running-in period of about 15 days. During the break-in period, we need to change the gear oil every time we use it. This is to ensure that the components on the cement block machine do not wear out improperly due to the reduced quality of the gear oil. Secondly, after we normally operate the cement block machine for 15 days, we need to clean the anti-wear hydraulic oil in the cement block machine. When cleaning, we need to clean the oil storage tank, valve body, oil block and other components with clean diesel oil, and wait for the cleaning work to be completed. Then pour clean hydraulic oil into the oil tank in the cement brick machine. The running-in period of the cement bricks hydraulic machine is mainly to make the vulnerable parts cooperate better and improve the use effect, so more attention should be paid during the running-in period.


☎ + (86) 18659803696

✉ sales@unikmachinery.com

✓ www.unikblockmachine.com


Send Inquiry