China Concrete Block Making Machine Suppliers

China Concrete Block Making Machine Suppliers
Details:
Dimension:5000 ×2450 ×2930mm
Weight:6T
Pallet size:880×680mm
Power:42.15 kW
Cycle time 15-20s
Vibration Force 50-70KN
Send Inquiry
Chat Now
Download
Description
Technical Parameters

CHINA CONCRETE BLOCK MAKING MACHINE SUPPLIERS
 

 

 

 

 

 

 

Products Description

 

 

From factory delivery to final scrappage, a concrete block forming machine typically goes through five stages. At each stage, the relationship between the customer and the machine changes. Understanding these five stages is more meaningful than simply comparing prices and specifications.

 

china-concrete-block-making-machine-suppliers

 

Technical specification:

 

Dimension 5000×2450 ×2930mm
Weight 6T
Pallet size 880 ×680mm
Power 42.15 kW
Vibration method Siemens motors
Vibration Frequency 3800-4500 r/min
Cycle time 15-20s
Vibration Force 50-70KN

Stage One: Selection

At this stage, the customer is faced with a vast amount of information, specifications, quotations, and sales promises. The biggest risk is not choosing the wrong model, but choosing the wrong "person" – the one who may or may not answer your call after the contract is signed.

What UNIK does at this stage is very simple: we clearly list the configuration, write the brand and model into the contract, and also specify what is not included. No hidden clauses, no "we'll talk about that later." Because we know that the transparency during the selection stage determines the foundation of trust for the next four stages.

Main features

china-concrete-block-making-machine-suppliers

 

  

Stage Two: Installation

Getting the equipment to your factory is only the first step. What truly brings the machine to life is the installation and commissioning process over the following days.

UNIK's engineers will be on‑site to handle everything – from unpacking and inventory checking, mechanical installation, and electrical wiring, to no‑load debugging, load trial production, and worker training. This phase typically takes one to two weeks. The engineers will not leave early – they will stay until you are able to operate the machine independently and produce qualified products continuously.

 

 

Products Pic Size Capacity Cycle time Daily capacity
Hollow block Hollow block 390 ×190 ×190mm 5pcs/pallet 15-20s 7200pcs
Hollow brick Hollow brick 240 ×115 ×90mm 16pcs/pallet 15-20s 23040pcs
Brick Brick 240 ×115 ×53mm 34pcs/pallet 15-20s 48960pcs
Paver Paver 200 ×100 ×60mm 20pcs/pallet 15-20s 28800 pcs

 

 

Stage Three: Daily Operation

This is the longest phase in the equipment's lifecycle – three to five years, or even longer. Equipment stability, energy consumption, and failure rate all come to the fore during this stage.

UNIK's customer repurchase rate exceeds 35%. The reason is simple: their machines rarely have problems during this phase. It is not luck – it is the result of accumulated expertise in materials and workmanship. The Q355B high‑strength manganese steel frame, Rexroth hydraulic system, and Siemens PLC – the stability of these branded components in daily operation is proven by the data.

 

 

 

 

Our factory.
china-concrete-block-making-machine-suppliers

 

Manufacturing

china-concrete-block-making-machine-suppliers

Delivery

china-concrete-block-making-machine-suppliers

workshop

china-concrete-block-making-machine-suppliers

Process

 

 


 

Stage Four: Maintenance & Repair

All equipment will age – the difference lies in maintenance costs and response time.

UNIK's after‑sales principle is: the technical department handles after‑sales directly – no need to go through sales. When you call us, the person on the other end understands the technology. Commonly used spare parts are stocked year‑round and shipped within three days after order confirmation. During the warranty period, engineers resolve issues remotely whenever possible; if they cannot, they process the necessary documents and depart.

Stage Five: Upgrade or Retirement

After five to eight years of operation, equipment owners typically face a choice: replace with new equipment, or upgrade.

Many of UNIK's long‑term customers choose the latter. Because UNIK's molds are compatible with more than 20 major international brand main machines, customers do not need to buy a new main machine just to change molds. The control system can also be partially upgraded without replacing the entire machine. This saves customers a substantial amount of reinvestment costs.

 

 

 